Lindz and I have our house walk-threw today at 3 were both pretty excited that it is finished and we get it in a week. Crazy to think we will have a house in a week. I can't wait. Today will be interesting making sure everything in the house works. So I have compiled a list. Here it is. Sorry short post.
Electrical Outlets
Switches
sinks
toilets
bathroom fans
windows
doors
locks
cupboards
garbage deposal
garage door
garage door openers
trim
fireplace
showers (hot water)
drain plugs
locks on doors,
Above garage painted and door painted outside
under patio door painted
water pressure,
walls for visable nails and cracks
cracked tiles
stains on ceiling
door hinges and latches
and if you open a door it stays open and doesnt swing back
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment